Development process
In 2006 09, Tongji University School of civil engineering of High-rise Structure Research Laboratory of Professor Ma renle reverse balance flange.
In December 19, 2006, China wind power in water in Baotou national rare earth hi tech Industrial Development Zone, the wind power industry park incorporated.
In 2008 02 months 18 days, the first 750kW fan reverse balance flange tower successfully installed in Liaoning Diaobingshan wind farm, the flange force and bolt anti loose started tracking measurement.
In 2008 03 months 10 days, reverse balance flange tower model in the State Key Laboratory of civil engineering through the limit loading test.
In 2008 04 months 17 days, reverse balance flange tower model in the State Key Laboratory of civil engineering by fatigue loading.
In 2008 04 months 21 days, " fan tower tube reverse balance flange test successful exchange " was held successfully.
In 2009 07 months 01 days, the first 1500kW fan beam slab prestressed anchor foundation concrete pouring completed.
In 2009 08 months 02 days, the first 1500kW fan reverse balance flange tower in Inner Mongolia Ulan Yili more wind field successfully installed, and the flange force and bolt anti loose started tracking measurement.
In October 20, 2009, the company's products 1500KW wind turbine tower flange obtained Kam value certification.
In 2010 05 months 25 days, gold wind, Tongji University, Beijing, China Baotou Tianyuan, water of Beijing Ulan Yili more wind reverse balance flange tower expansion bolt pretightening force and vibration characteristics of the successful completion of the tower measured.
In November 8, 2010, completed the beam slab foundation prestressed anchor bolts of concrete pouring first 3000kW fan intertidal zone.
In March 4, 2011, with the first 3000kW fan reverse balance flange tower successfully installed in Shandong, the Gulf of Laizhou Hutouya tide, the flange force and bolt anti loose started tracking measurement.
In January 7, 2011, Jiangsu gold wind power technology Co., Ltd. was established in Jiangsu Province, Yancheng City Funing Economic Development Zone registered.
In 2012 June, Jiangsu New Energy Technology Co., Ltd. gold began trial operation.
In July 17, 2012, the company's products 1500MW reverse balance flange and prestressed anchor bolts assembly for China Veritas certification.
In December 20, 2012, Jiangsu Jin Haixin energy science and technology limited company approved "Yancheng City engineering technology center".
In December 9, 2012, 3 of the products are sets of 2500KW tower fan prestressed anchor bolts assembly exports to Thailand THEPPANA WIND FRAM project.
In 2013 April, the patent "wind turbine reverse balance flange development and application" and "wind turbine beam slab prestressed anchor based development and application" was named the 2013 annual Chinese power construction science and technology achievement award.
In December 3, 2013, Jiangsu Jin Haixin energy science and technology limited company approved the "national high tech enterprise".
In 2014 April, 30 of the products are sets of 2500KW tower fan prestressed anchor bolts assembly exports Sweden bracken wind power project III.


Copyright@2012 Jiangsu JinHai New Energy Technology co., LTD All Right Reserved Human resources | Contact information
Address: Funing County Economic Development Zone Xin 36 Avenue